News
The 19.15 km line will enhance connectivity, passing key points. Currently, three trains will operate at 25-minute intervals, pending safety inspections.
TRSL to deliver India-made trains for Bengaluru's Yellow Line from August; two trains per month starting September.
Bengaluru’s Namma Metro Yellow Line is set to open in early August with limited trains, pending safety approvals, covering 16 ...
The 19.15-kilometre-long Yellow Line will connect RV Road with Bommasandra and will traverse several major parts of the city, ...
1don MSN
Bengaluru's Namma Metro Yellow Line, an 18.8 km elevated stretch connecting RV Road to Bommasandra, is nearing completion ...
Yellow Line to open in August post safety inspection; BMRCL prepares for launch with limited trains and driverless tech.
Long-awaited Yellow Line of the Namma Metro, connecting R V Road to Bommasandra, is finally inching towards launch, with the ...
By January 2025, the second prototype arrived, followed by a third train in May. All three trains underwent extensive trials.
BMRCL plans to open the 19.15-km Yellow Line by August, aiming to boost daily metro ridership from 8.5 lakh to 14 lakh. BCIC ...
The Congress government, which came to power in May 2023, has been taking decisions that are in sharp contrast to its ...
Bengaluru: Namma Metro's Yellow Line is likely to become operational by Aug, BMRCL MD Maheshwar Rao said at an event ...
Bengaluru: With the long-delayed Yellow Line of Namma Metro to Electronics City still not open to public, thousands of ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results