News

The 19.15 km line will enhance connectivity, passing key points. Currently, three trains will operate at 25-minute intervals, pending safety inspections.
The much-awaited Yellow Line of Bengaluru’s Namma Metro, stretching 19.15 km from RV Road to Bommasandra, has faced repeated ...
Bangalore MP Tejasvi Surya asks people to join a protest on July 5 to demand the delayed Yellow Line metro opens soon.
Public outcry grows as Namma Metro's Yellow Line faces yet another delay, sparking criticism and protest over constant ...
Bangalore South MP Tejasvi Surya has called out BMRCL over the prolonged delay in launching the Yellow Line metro. He urged ...
TRSL to deliver India-made trains for Bengaluru's Yellow Line from August; two trains per month starting September.
Yellow Line to open in August post safety inspection; BMRCL prepares for launch with limited trains and driverless tech.
Bengaluru Metro’s 19-km Yellow Line connecting RV Road and Bommasandra was originally scheduled to open in December 2021. MP ...
The 19.15-kilometre-long Yellow Line will connect RV Road with Bommasandra and will traverse several major parts of the city, ...
Bengaluru’s Namma Metro Yellow Line is set to open in early August with limited trains, pending safety approvals, covering 16 ...
The Bengaluru Metro Rail Corporation Limited (BMRCL) has announced a brief suspension of services on a section of the Purple ...
By January 2025, the second prototype arrived, followed by a third train in May. All three trains underwent extensive trials.